Find Jobs
Hire Freelancers

Assignment Six Sigma

$15-25 USD / hour

Cancelado
Publicado hace alrededor de 11 años

$15-25 USD / hour

After receiving the go-ahead to build a DMAIC Six Sigma project from Julianne Ruddock, President of Print Right, and having gone through a thorough Define phase, Keesha Grifin was excited to move on to the measure and Analyse phase of the project. While Keesha was preparing her define phase, inspector Hector Jones convinced Eric McKeever to train three operators and incorporate a quality assurance system. Each operator therefore needed to assess the inspection standards against the customer’s requirements. Hector gave training on what was a good print to the three operators. Keesha was not convinced that it was a good choice and decided to run an MSA. For the following questions, use spreadsheet labeled: Assignment2 [login to view URL] Question 1: Use the table in tab ‘Q1’ of the spreadsheet to prove that Keesha was right in conducting the MSA. Keesha proceeded to convinced Black Belt Tuan Kopke to invest in a Fluzo HD-O-550 optical crosshair measuring system that measures the alignment of printed crosshairs. When the two + are aligned, the printing is perfectly adjusted and the absolute distance measured in mm is 0. Sampling of the measurements will allow for a more accurate and precise quality measurement system. A representative from the Fluzo Company attached a test unit and Keesha gathered measurements from 10 different batches. Question 2: Use table in tab ‘Q2’ of the spreadsheet to prove that Keesha is correct in requesting this investment and that the measuring system will provide the specifications required. After running many type trials, Keesha decided to look at the capability of her process. This will serve as a good baseline for future reference and will help her convince Eric McKeever that there are controllable factors affecting the production quality. Question 3: Use table in tab ‘Q3’ of the spreadsheet to display the process capability. (Assume historical mean of .09mm and an USL of .097mm) Keesha used her fishbone and decided to measure a few vital Xs in order to sift through potential improvements. Question 4: Use table in tab ‘Q4’ of the spreadsheet to display the relative magnitude of the sources of variation. After consultation with Hector Jones and others on her team, Keesha wanted to confirm the hypothesis that relative humidity might have an effect on the alignment. Question 5: Use table in tab ‘Q5’ of the spreadsheet to make an inference about the effect of the relative humidity. For the above questions, use Minitab and include your outputs by pasting the graphs and relative session outputs. Notes: Partial marks will be given however late assignments will not be accepted. Each question is worth 2 points for a total of 10.
ID del proyecto: 4355946

Información sobre el proyecto

1 propuesta
Proyecto remoto
Activo hace 11 años

¿Buscas ganar dinero?

Beneficios de presentar ofertas en Freelancer

Fija tu plazo y presupuesto
Cobra por tu trabajo
Describe tu propuesta
Es gratis registrarse y presentar ofertas en los trabajos
1 freelancer está ofertando un promedio de $20 USD /hora por este trabajo
Avatar del usuario
consider it done.
$20 USD en 3 días
0,0 (0 comentarios)
0,0
0,0

Sobre este cliente

Bandera de CANADA
Toronto, Canada
5,0
1
Miembro desde mar 21, 2013

Verificación del cliente

¡Gracias! Te hemos enviado un enlace para reclamar tu crédito gratuito.
Algo salió mal al enviar tu correo electrónico. Por favor, intenta de nuevo.
Usuarios registrados Total de empleos publicados
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)
Copyright © 2024 Freelancer Technology Pty Limited (ACN 142 189 759)
Cargando visualización previa
Permiso concedido para Geolocalización.
Tu sesión de acceso ha expirado y has sido desconectado. Por favor, inica sesión nuevamente.