BIO-DATA
AYAZUL.F.RAB
203 B1 Rachna Gokul
T-Point Mankapur Ring Road
Nagpur 440 030
DATE OF BIRTH - 20/07/1965
MARITIAL STATUS © MARRIED
Tel [login to view URL]
E-mail
EDUCATIONAL QUALIFICATION©S
1. S.S.C, 1980 Science 1stClass.
2. H.S.S.C. 1982 Science (Technical) 1st Class.
PROFESSIONAL QUALIFICATION©S
1. B.E. (MECH.), 1986 1st Class Govt. Engg. College, Amravati, (Nagpur University)
2. Post Graduate Diploma in Industrial Management, 1st Class 1996 V.R.C.E. Nagpur.
COMPUTER SKILL'S
MS OFFICE & MS PROJECT & to some Extent Tally
EXPERIENCE DETAILS
From June 2001 Till Date: - SELF-EMPLOYED
Training & consultancy for Ms Project specializing in: -
Ø Training, consultancy & custom software development.
Ø Integrating MS Project with other product utilizing V.B.A., specializing in integrating with MS Office suite of application.
Ø Helping an organization implement MS Project across an enterprise, utilizing the work group features, web publishing & multiple project consolidation capabilities of the software.
PROJECTS COMPLETED
§ Scheduling of MSRTC Bus Depot Sakoli, Bhandara.
§ Held workshop at Govt. Polytechnic, Nagpur under CIIILP.
§ RITES Ltd. (Min. of Railways), Nagpur (Training cum Consultancy Programme on Ms Project).
§ Power Grid Corp of India ltd (Software Development & EDP of Personnel Dept).
On Going Project©s
§ National Academy of Direct Taxes NAGPUR, PAYROLL (Excel/V.B.A.).
From Sept 99 till May 2001.
As a lecturer in Mech Engg Dep't With Govt Polytechnic Sakoli, Bhandara.
From June 98 to Sept 99.
As a Service Engineer with Central Engineering Corporation Nagpur, looking after Maint Of Material Handling Equipments.
From Dec. 96 to May 98.
As a Lecturer in Mech. Engg. Dep©t with Anjuman Polytechnic, Sadar, Nagpur.
From Oct. 92 to Oct. 96
Sr. Engineer (Mech.)
Reva Enviro Systems Pvt. Ltd.
Nagpur (INDIA)
To co-ordinate various EPC Project going all over India on consultancy basis as well as on turnkey basis.
To prepare general mechanical engineering drawing, quantity surveys & other related jobs. Also the undertake site supervision work including engineering supervision of sub-contractors work, liaison with other site staff and client, etc.
To assist in getting quotation from prospective suppliers for bought out items and to follow up on the proposals such that purchase orders can be released for these items. To coordinate procurement of such equipments and to assist in arrangements for delivery of these items at site in time & to inspect these items whenever required before required before dispatch to site.
Implementing project design and monitoring project activities as per planning.
To get project drawing approved by the client and its consultant and to assist company management in getting payment cleared by the client.
Plus to co-ordinate in design and drawing and helping in total project concept right from process selection up to complete project implementation and commissioning of the Project.
To prepare maint schedule of the project to keep it running up to the guarantee period.
Reporting to director Tech.
From Dec 90 till Aug. 92.
Plant Engr.
Carbide Hashim Industrial Gases Co. Ltd.
Jeddah, SAUDI ARABIA.
1] Installation & Commissioning of Powder Coating Painting Plant supplied by M/s Eisenmann Germany at Electric Panel Board Factory (a Division of Abdullah Hashim Group).
2] Operation & Maint of 60 tonne Air Separation plant manufacturing high purity Liquid Nitrogen, Oxygen & Argon.
More over trouble shooting of Process, Mech as well as Elect problem plus assisting Plant manager for the procurement of various Engg. Materials as well as delivery of various liquids.
Reporting to the Plant Manager.
From Aug. 86 to Oct. 90.
Deputy Plant Engr (Extrusions)
Carbon Corp. Ltd.,
Nasik (INDIA)
As a shift in-charge to lead a team of @ 20 work hand for Operation & Trouble shooting of Raymond Mill, Jaw Crusher, Hammer Mill, Double Roller Crushers, Vibratory Screens, Valves & Pipelines for Mat©l handling, Bucket Elevators, Belt Conveyors, Vibratory Feeders, Screw Conveyors, Automatic Weighing System (Computerized), Dust Collectors on Carbon Extrusion Plant (Hydraulics operations 1824Tonne).
Plus to supervise various activities such as die changing, burner firing etc. Operations & Trouble Shooting of Coolers, Hot Mixers, Thermic Fluid Heaters (Thermax Make), Extrusion Press & Utilities so as to keep the process moving to maximize the production of Graphite Electrodes (Extrusion Phase).
Reporting to Asst. Plant Manager.
I hereby declare that the information given above is true & correct to the best of my knowledge.
(A.F. RAB)