Find Jobs
Hire Freelancers

Bridge Building Competition

$30-250 USD

Cerrado
Publicado hace más de 13 años

$30-250 USD

Pagado a la entrega
1. The minimum unsupported span must allow a 1000mm long by 150mm high box to pass freely underneath the bridge. 2. The maximum unsupported span length cannot exceed 1200mm. The maximum length of the entire bridge must not exceed 1350mm. 3. The minimum operating width of the bridge deck must be 150mm. It must run the entire length of the bridge. The continuous deck must be constructed entirely of wood (i.e. no solid glue decks). 4. The maximum width of the bridge at any point must be no more than 350mm, so it can fit into the testing apparatus. 5. The maximum height of the bridge (from the ground to the tallest point) must not exceed 600mm. 6. The maximum height of the span (the deck or platform) must be less than 450 mm from the ground. 7. The maximum deflection of the road deck is 50mm. If the bridge has not failed once this deflection is reached, the carried load at that point will become its ultimate load. 8. At the weigh in, each competitor will be given a dead weight of 8 kg (20 lbs). Six, evenly distributed points on the bridge span will be designated by the weigh-in committee for the bridge. Each team will be presented a dice to roll, with each value representing one of the designated points along the span. The team must then place the dead weight on that designated position of the span for 5 seconds. This procedure will be repeated twice. The first point will be eliminated on the second roll (i.e. can’t test same point twice). A 25 % penalty to the total score will be applied to bridges that cannot support this dead weight. Definition of Failure: If one or more members of the bridge structure completely fractures (i.e. full fracture of any member). 9. A smooth continuous bridge deck for vehicular traffic must be provided along the entire span of the bridge. 10. The slope of the deck must not exceed 6%. 11. The load will be applied on the deck of the bridge. An opening of 100mm by 100mm must be left above the center of the bridge deck so that loading may be applied at the center point. 12. Anchorage of piers is not permitted and no external anchorage is permitted. 13. The maximum bridge weight is limited to 4.0kg, and the minimum weight is 1.0kg.
ID del proyecto: 905075

Información sobre el proyecto

3 propuestas
Proyecto remoto
Activo hace 13 años

¿Buscas ganar dinero?

Beneficios de presentar ofertas en Freelancer

Fija tu plazo y presupuesto
Cobra por tu trabajo
Describe tu propuesta
Es gratis registrarse y presentar ofertas en los trabajos
3 freelancers están ofertando un promedio de $110 USD por este trabajo
Avatar del usuario
I can do this job for you. Please check PMB.
$30 USD en 15 días
0,0 (0 comentarios)
0,0
0,0
Avatar del usuario
See my profile and you'll come to know that I am the right guy for such type of projects.
$200 USD en 20 días
0,0 (0 comentarios)
0,0
0,0
Avatar del usuario
Structural Engineer
$100 USD en 3 días
0,0 (0 comentarios)
0,0
0,0

Sobre este cliente

Bandera de CANADA
Toronto, Canada
0,0
0
Miembro desde ene 6, 2011

Verificación del cliente

¡Gracias! Te hemos enviado un enlace para reclamar tu crédito gratuito.
Algo salió mal al enviar tu correo electrónico. Por favor, intenta de nuevo.
Usuarios registrados Total de empleos publicados
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)
Copyright © 2024 Freelancer Technology Pty Limited (ACN 142 189 759)
Cargando visualización previa
Permiso concedido para Geolocalización.
Tu sesión de acceso ha expirado y has sido desconectado. Por favor, inica sesión nuevamente.